Beginning on May 29th and going through June 1st, the building will be doing maintenance on the HVAC systems in our data center. Additional, temporary, HVAC systems are already on the floor awaiting duct work and set up. We are not anticipating any issues, though we will be monitoring the temperature in the data center for the duration. The building is installing shutoff valves throughout the glycol piping. There are 2 HVAC systems in operation. Only 1/2 of the cooling systems will be taken down at any one time and the temporary HVAC gear will take on the load during these periods. Support can be reached Monday thru Friday from 8:00am until 8:00pm, Saturdays from 11:00am until 4:00pm via phone at 612-337-6340, or via email at [log in to unmask] -- Mike Horwath [log in to unmask] ipHouse - Welcome home!