As was told to me last night, and physically verified late last night,
the MUX is only powered by the 'A' side of the 48v D/C power plant.

Electrictions tonight are supposed to extend the B side power into the
system, as the A side is looking good, no outage is expected.

I do not have a time for this work yet, though.  Estimations were for
~11:00pm tonight.  I'll try to find something more concrete.