As was told to me last night, and physically verified late last night, the MUX is only powered by the 'A' side of the 48v D/C power plant. Electrictions tonight are supposed to extend the B side power into the system, as the A side is looking good, no outage is expected. I do not have a time for this work yet, though. Estimations were for ~11:00pm tonight. I'll try to find something more concrete. Support can be reached Monday thru Friday from 8:00am until 8:00pm, Saturdays from 11:00am until 4:00pm via phone at 612-337-6340, or via email at [log in to unmask] -- Mike Horwath [log in to unmask] ipHouse - Welcome home!