Print

Print


On Thu, May 19, 2011 at 10:07:37AM -0500, Mike Hemphill wrote:
> It looks like we (Dave Farmer & FWR) will be putting up a second Gig link
> over copper between the CNS & core MICE sw later this AM.

Dave and I have completed the ether channel to bring it up to a 2Gbps 
cross link between the two switches..

MICE-gig-sw-1#show etherchannel port-channel 
                Channel-group listing: 
                ----------------------

Group: 1 
----------
                Port-channels in the group: 
                ---------------------------

Port-channel: Po1
------------

Age of the Port-channel   = 0d:03h:38m:32s
Logical slot/port   = 11/1          Number of ports = 2
GC                  = 0x00000000
Port state          = Port-channel Ag-Inuse 
Protocol            =    -
Port security       = Disabled

Ports in the Port-channel: 

Index   Load   Port     EC state        No of bits
------+------+------+------------------+-----------
  1     00     Gi1/2    On                 0
  0     00     Gi2/45   On                 0

Time since last port bundled:    0d:00h:12m:09s    Gi1/2
Time since last port Un-bundled: 0d:02h:19m:56s    Gi2/45



It looks like the traffic load balancing is a little uneven, but Dave
and I will keep watch on it.

-- 
Doug McIntyre                            <[log in to unmask]>
          -- ipHouse/Goldengate/Bitstream/ProNS -- 
       Network Engineer/Provisioning/Jack of all Trades

########################################################################

To unsubscribe from the MICE-DISCUSS list, click the following link:
http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1