Print

Print


Doug,

Sounds great, thanks for the work on this!

-Nevin

On Friday, April 3, 2015 5:53pm, "Doug McIntyre" <[log in to unmask]> said:

> On Tue, Mar 31, 2015 at 11:50:19AM -0500, Doug McIntyre wrote:
>> I should schedule up a time when I swap out the RR's with the new hardware.
>> I have them ready, just need to get them there at online.
> 
> And this process is done.
> 
> I have both new sets of hardware installed and happy. I have roughly
> the same # of routes coming into each being distributed out. The routing looks
> good from the RR's as well as my site (ipHouse).
> 
> I also left my last build of a route reflector hardware (the one with
> the SAS6/i controller, so no battery, no battery deep cycle testing)
> as a cold spare here. Jeff has offered up another R320 when they are
> done as another cold spare I believe, so we'll have two loaded up cold
> spares ready to go.  If I bring in some duplex power cables, I could
> make them warm spares, ready to kick over with DRAC when needed, I have
> some in my pile, since I don't use them. (obviously they'd still
> be A + B power, not single powered).
> 
> Should be all good. Speak up if not.
> --
> Doug McIntyre                            <[log in to unmask]>
>                     ~.~ ipHouse ~.~
>        Network Engineer/Provisioning/Jack of all Trades
> 



-- Nevin Lyne
-- Founder & Director of Technology
-- Arcustech, LLC. - arcustech.com
-- Gippy's Internet Solutions, LLC. - enginehosting.com