Doug, Sounds great, thanks for the work on this! -Nevin On Friday, April 3, 2015 5:53pm, "Doug McIntyre" <[log in to unmask]> said: > On Tue, Mar 31, 2015 at 11:50:19AM -0500, Doug McIntyre wrote: >> I should schedule up a time when I swap out the RR's with the new hardware. >> I have them ready, just need to get them there at online. > > And this process is done. > > I have both new sets of hardware installed and happy. I have roughly > the same # of routes coming into each being distributed out. The routing looks > good from the RR's as well as my site (ipHouse). > > I also left my last build of a route reflector hardware (the one with > the SAS6/i controller, so no battery, no battery deep cycle testing) > as a cold spare here. Jeff has offered up another R320 when they are > done as another cold spare I believe, so we'll have two loaded up cold > spares ready to go. If I bring in some duplex power cables, I could > make them warm spares, ready to kick over with DRAC when needed, I have > some in my pile, since I don't use them. (obviously they'd still > be A + B power, not single powered). > > Should be all good. Speak up if not. > -- > Doug McIntyre <[log in to unmask]> > ~.~ ipHouse ~.~ > Network Engineer/Provisioning/Jack of all Trades > -- Nevin Lyne -- Founder & Director of Technology -- Arcustech, LLC. - arcustech.com -- Gippy's Internet Solutions, LLC. - enginehosting.com