Print

Print


On 09/29/2016 09:34 PM, Jeremy Lumby wrote:
> On the new 4200 side ae0 is made up of xe-0/1/0 and xe-0/1/2
> On the existing stack ae11 is made up of xe-0/2/2 and xe-2/0/16
> xe-0/1/0 is connected to xe-0/2/2 and xe-0/1/2 is connected to xe-2/0/16 via 10G DAC cables (which I donated)
> With the exception of the 4 SFP ports and route server #2 that Jay mentioned, all moves will be to the same numbered port on the switch.  In the old stack, they are all ge-1/0/x, and on the new 4200, they will all be ge-0/0/x  I will keep the x the same so I moved my port from ge-1/0/11 to ge-0/0/11 and the looking glass has also been moved to ge-0/0/0  All other moves will happen during the Tuesday afternoon maintenance window.

Thanks! I've updated the website.

And thanks for the donation of the DAC cables!

-- 
Richard