On Thu, May 19, 2011 at 10:07:37AM -0500, Mike Hemphill wrote:
> It looks like we (Dave Farmer & FWR) will be putting up a second Gig link
> over copper between the CNS & core MICE sw later this AM.
Dave and I have completed the ether channel to bring it up to a 2Gbps
cross link between the two switches..
MICE-gig-sw-1#show etherchannel port-channel
Channel-group listing:
----------------------
Group: 1
----------
Port-channels in the group:
---------------------------
Port-channel: Po1
------------
Age of the Port-channel = 0d:03h:38m:32s
Logical slot/port = 11/1 Number of ports = 2
GC = 0x00000000
Port state = Port-channel Ag-Inuse
Protocol = -
Port security = Disabled
Ports in the Port-channel:
Index Load Port EC state No of bits
------+------+------+------------------+-----------
1 00 Gi1/2 On 0
0 00 Gi2/45 On 0
Time since last port bundled: 0d:00h:12m:09s Gi1/2
Time since last port Un-bundled: 0d:02h:19m:56s Gi2/45
It looks like the traffic load balancing is a little uneven, but Dave
and I will keep watch on it.
--
Doug McIntyre <[log in to unmask]>
-- ipHouse/Goldengate/Bitstream/ProNS --
Network Engineer/Provisioning/Jack of all Trades
########################################################################
To unsubscribe from the MICE-DISCUSS list, click the following link:
http://lists.iphouse.net/cgi-bin/wa?SUBED1=MICE-DISCUSS&A=1
|